In 2016, the School District of Greenville County sought a trusted partner to upgrade the lighting systems throughout the district. Using both design-bid build and design-build approaches, we have completed LED upgrades to 125+ district owned buildings.
Our Approach
Based on our successful track record with the school district during the design-bid build phase, we were able to incorporate the design-build approach to complete the balance of their schools by performing detailed investment-grade audits for each building. Custom drawings were engineered to meet the district’s energy and performance goals while ensuring product continuity.
The Result
Buildings Retrofit: 125
Total Square Footage: 11,700,000
Fixtures Retrofitted: 134,893
kWh Reduction (LTG): 68%
Annual Energy Savings: $3,220,000
Rebates & Incentives: $5,390,000
Flip the switch on poor lighting and high expenses.
Gain a seamless, safer, and sustainable lighting solution that will boost your employees' productivity and your business's success.
In 2016, the School District of Greenville County sought a trusted partner to upgrade the lighting systems throughout the district. Using both design-bid build and design-build approaches, we have completed LED upgrades to 125+ district owned buildings.